Friday, March 27, 2015

Saturday, March 21, 2015

Boxwood Prices

Scotlyn Yard boxwoods  prices for sale to The Chattooga Club 3-21-2015

42"    $290
36"    $155

McCarley boxwood prices (not installed)

42"   $168
36"   $96

Why pay the difference?



Wednesday, March 18, 2015

Concept for Landscape of Bear Bar

This illustration shows the end of the pavilion with an attached 24' patio which is hedged with 30" box woods . A single large tree provides shade and privacy.

Tuesday, March 17, 2015

Pot samples for the pool.

Please let us  know if any of these are good for the pool.






Update on work and projects 3-17-2015

Replacing this planting with younger, smaller plants would improve the looks of the arbor.
The clematis vine should be left. It is spectacular in the fall.
2 x 40" plants and 6 x 36" plants would be used at each of the 2 ardors.
 The cost to do both arbors would be $2,200.00

If we  want to lower this hedge to the top of the wall this spring is the time to do it.

Pictured above are shout of the dog park area cleared and mulched.
There is a little grading which needs doing to correct water problem.
Joel Rice will be doing that work shortly.
We should be complete be Easter.
Fence contractor due here to price project tomorrow or Friday.


Sunday, March 8, 2015

Plant order for the Chestnut pool.

Chattooga Club no size location species nursery
Chestnut Pool
Plant Material
3/7/2015
deliver 4-15-2015
grasses 72 #3 eastside switch grass HR
49 #3 Westside fountain  grass
tall  perennials 15 #1 eastside Joe Pye
10 sun flower
15 calamagrostis
hibiscus
short perennial:  105 #1 eastside RB
#1 plants 15 sedum Ruby Glow
15 sedum Autumn Joy
25 rudbecia fulgida ' Goldstrum"
10 perovskia atrriplicifolia
5 liatris spicata
5 hibiscus moschentos
10 aster frikartii
10 alchemilla
98 br Westside daylilies CGC
trees 15 eastside
shrubs 4 40" northern boxwood Gant
48 #2 northern

Thursday, March 5, 2015

Trailer In Poor condition.

trailer located behind the spa
What should be done with this trailer?
Pool construction will soon land lock it.
If it  stays ts appearance needs to be improved.

Wednesday, March 4, 2015

update 3-4-2015

Chestnut pool:

    The landscape plan for the pool has shown and the reaction favorable. The next set is to request
money to buy plant material for May 15 delivery .($6,300)

Garden:

    JR has requested the swing set be moved. I have shown Enrique the chosen spot, behind
the chicken pen.
     The raised bed which are presently where the swing set will go will be moved to the spot formerly occupied by the swings.
     The fire pit also needs to be move away from the pool, and will be relocated on a flat area
up the hill from its present  location.

Dog park:

      I have ordered the waste container for the park, and am getting bids for the fence ( flat black color, 4 foot height.
       Enrique will begin the clean up and removal of the existing wooden fence as soon as the weather
permits. Mulch for the banks will follow.
      I am going to suggest that the unused areas be planted with white pine seedlings. They will
reduce labor as they get larger as well as provide screening of CC from the road. The cost is nominal
.